| Scientific Collector's Permit |
A: 165. Scientific Collectors Permit |
|
02/28/2027 |
|
| Error Checked 2025 dataset uploaded to GEDMS |
B: 159. Transfer certified data currently stored in MS Access database to the Geospatial Enabled Database. |
|
02/28/2027 |
|
| Project Coordination |
C: 189. Project Coordination and annual meeting. |
|
02/28/2027 |
|
| Study Plans |
D: 156. Review and Revise Monitoring Resources Protocols |
|
02/28/2027 |
|
| Updated dataset in MS Access and uploaded to GEDMS. |
E: 160. Update and maintain an MS Access-based database system for WDFW JSAP data. |
|
02/28/2027 |
|
| Dataset of PIT tags |
F: 158. PIT tag Redband Trout (upper Columbia River tributaries). |
|
02/28/2027 |
|
| Error checked data set of PIT tagged Redband Trout |
G: 158. PIT tag wild Rainbow Trout - Kettle River tributaries |
|
02/28/2027 |
|
| Produce accessible, error-checked datasets |
H: 157. Conduct fishery surveys at Onion Creek |
|
02/28/2027 |
|
| Deliverable: An accessible, error-checked data set with metadata |
I: 162. Analysis of fish surveys at Onion Creek |
|
02/28/2027 |
|
| Produce accessible, error-checked datasets |
J: 157. Conduct Redband Trout surveys at Big Sheep Creek |
|
02/28/2027 |
|
| Deliverable: An accessible, error-checked data set with metadata |
K: 162. Analysis of Redband Trout surveys at Big Sheep Creek |
|
02/28/2027 |
|
| Produce accessible, error-checked datasets |
L: 157. Upper Kettle River Rainbow Trout Genetics |
|
02/28/2027 |
|
| Deliverable: An accessible, error-checked data set with metadata |
M: 162. Analysis of Rainbow Trout genetic samples |
|
02/28/2027 |
|
| Produce accessible, error-checked datasets |
N: 157. Conduct fisheries surveys at Kettle River tributaries |
|
02/28/2027 |
|
| Deliverable: An accessible, error-checked data set with metadata |
O: 162. Analysis of fisheries surveys at upper Kettle River tributaries. |
|
02/28/2027 |
|
| Produce accessible, error-checked datasets |
P: 157. Conduct environmental DNA (eDNA) sampling at Kettle River tributaries. |
|
02/28/2027 |
|
| Deliverable: An accessible, error-checked data set with metadata |
Q: 162. Analysis of Environmental DNA (eDNA) surveys at Kettle River tributaries |
|
02/28/2027 |
|
| Effective implementation management and timely contract administration |
R: 119. Manage and administer WDFW portion of project implementation. |
|
02/28/2027 |
|
| Completed Progress (Annual) Report |
S: 132. Submit Progress Report for the period (Mar 2025) to (Feb 2026) |
|
02/28/2027 |
|